Planning, simulation and optimization of factories and logistics systems

 
 

acp-IT accompanies you during design, simulation and optimization of your production or logistics system. We see ourselves as a competent and experienced partner for factory planning and planning of flow of materials. Using state-of-the-art planning and simulation tools and with our comprehensive logistics know-how, we solve your tasks regarding:

  • Resource capacity planning 
  • Flow of materials planning
  • Layout planning
  • Planning of storage and transport processes
  • Conception and planning of flow of material automation (storage, transport, identification) 
  • Optimization of logistics of existing productions
  • Efficiency rating based on real log data and identification of bottle necks 
  • Development and continuous monitoring of key performance indicators (KPI) and logging of operating figues (e.g. overall equipment efficiency) 
  • Implementation of logistics strategies (Kanban, Just-In-Time, Just-In-Sequence)
 
 

DF_3.jpg

 

Customer's benefits:

  • Support with factory planning questions 
  • Conception of best practice automation and logistics solutions
  • Established fundamentals for investment decisions

Competences of acp-IT:

  • Wealth of methodical knowledge and competent project management
  • Use of state-of-the-art methods for factory planning and design of logistics systems
  • Extensive project history in planning and optimizing semiconductor factories

Our services: 

  • Simulation based planning and optimization of logistics
  • Integration of key performance indicators
  • Profitability analysis of flow of materials and logistics systems - cost of ownership (CoO), Return of Investment (ROI), benefit analysis

References:

  • Capacity profiling of a new factory for optoelectronic devices
  • Automation concept for a flat panel production
  • Simulation and Optimization of the manual material transport strategy for a leading semiconductor manufacturer
  • Simulation of the automated transport system for an European semiconductor manufacturer
  • Design of the fully automated transport system for a 300mm semiconductor line, planning and realization of the acceptance tests
  • Simulation and system optimization of the AMHS (Just-In-Time material supply)
  • Workflow definition for the AMHS
Deutsch
contact   Imprint   login © acp Information Technology AG